Flat Buckle
-
Payment
-
Origin
China Mainland
-
Minimum Order
15
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
When normal operation, it is forbidden to change the direction of the operation to prevent the loss of composite film. In normal operation, the air compressor main air path can not have the phenomenon of leakage, to ensure adequate air flow and wind pressure, in order to extend the use of diamond composite film. The first time of the new composite piece of the first use of the low speed running in half an hour, and then gradually normal use. To reduce the axial pressure and rotate speed, to prevent the bit fault in the geological environment. In normal drilling operations, if you want to change a bit, to strictly check the hole in the hole is a debris, must ensure that the hole can be used to clean the new composite piece of.
- Hole Drill 15 Pieces / (Min. Order)
- Rotary Drill Rod 15 Pieces / (Min. Order)
- Core Casing 15 Pieces / (Min. Order)
- New Type Gas Discharge Pipe 15 Pieces / (Min. Order)
- Anchor Rod 15 Pieces / (Min. Order)
- New Type Of Drill Pipe 15 Pieces / (Min. Order)
- Triangular Drilling Rod 15 Pieces / (Min. Order)
- Geological Spiral Drill Pipe 15 Pieces / (Min. Order)
- Geological Drill Pipe 15 Pieces / (Min. Order)